A response action plan is a detailed report that includes the steps to remediate waste materials, soil, surface water, ground water, and/or vapor contamination at the property. The RAP includes the intended level of cleanup (residential, industrial, recreational, etc.) for the future property use.
Landmark knows how to develop response action plans that control and minimize remediation costs. The key is to prepare the plan with a clearly defined use of the property so that if unexpected conditions are encountered, the construction project is not delayed, wasting time and money. Landmark works closely with our clients to develop property-specific cleanup goals that meet regulatory requirements and the client’s needs for the planned property use. Our strong team-building skills help to develop plans that eliminate unnecessary remediation, and our contingency plans help streamline solutions to any unexpected events encountered during construction.